Shell shuts oil pipeline six days after reopening, production drops by 150,000 barrels

Six days after it reopened the Trans Niger Pipeline, which was shut down following a fire incident in June, Shell Petroleum Development Company of Nigeria Limited has again shut the pipeline due to a leak. As a result, 150,000 barrels per day of oil has been deferred with grave implication for the Federal Government, which […]

Shell shuts oil pipeline six days after reopening, production drops by 150,000 barrels

Powered by WPeMatico

Share
This entry was posted in Business. Bookmark the permalink.

Comments are closed.