TrustPower’s 270MW wind farm components in transit from Siemens

Siemens’ Australia-based 270MW Snowtown II wind farm is nearing the construction phase as the hundreds of components required for the build are transported cross-country to the site.

Powered by WPeMatico

This entry was posted in Africa ECO. Bookmark the permalink.

Comments are closed.