Goldwind partially refused permission for 165.5MW wind in New South Wales

Chinese wind developer Goldwind has been refused permission by the local council to run an underground cable needed for its 165.5MW wind farm in New South Wales.

Powered by WPeMatico

This entry was posted in Africa ECO. Bookmark the permalink.

Comments are closed.