ACTOM MV Switchgear wins R66mn contract for transformer kiosks for Jeffrey’s Bay wind farm

A R66m contract for design, manufacture and supply of 60 pad-mounted transformer kiosks for the 138 MW Jeffrey’s Bay wind farm in the Eastern Cape has been awarded to ACTOM MV Switchgear.

Powered by WPeMatico

This entry was posted in South Africa News. Bookmark the permalink.

Leave a Reply